Wow, 60 days of working on my #100dayproject2020!
I'm enjoying seeing my Covid-19 on the design wall, it gives me an idea of what I need and where to go from here.
I got 7 more blocks made, all on the reddish scale.
But, before I did all that, we decided to go ahead and seal the deck this morning. It's supposed to start raining Saturday afternoon, and not stop for a week or so. So, it was either wait the rains out or do it this morning. We just want to get the deck done, so we went for it. I was fine with the color the deck is now, Darrell wanted it to get a bit darker (the sun will make it darker). Once we seal it with the UV protectant, that process will slow down. Putting the sealer on it, darkened it up quite a bit, so I think he ended up okay with the way it looks. I think it's great!
|
First, he trimmed all of the posts to height. |
|
Mixing up the sealer. |
|
He painted the sides of the boards and I rolled it onto the surface. |
|
We locked the dog door with the dogs and cats inside. They were confused and not happy. |
|
After it set up a bit, then he wiped it down. |
It's beautiful!
No comments:
Post a Comment